Brian
Strachan, shown on left, is the largest user of
Fast-Tube in Western Canada |
Brian Strachan, President
of Strachan Investments Ltd., Surrey, BC, has been in the concrete forming
business for over 12 years. His company has five employees and
places between 150 and 200 cubic meters of concrete per week.
"Each product has it's
advantages and disadvantages", said Brian. "We used to install the
cardboard tubes at the last minute to prevent water damage. Now I
give a roll of Fast-Tube™ to each of my crews, and they install upon
the completion of the formwork, regardless of the weather - rather
than when the concrete shows up. It makes my life a lot
simpler. The disadvantage of fabric is that a tear
can lead to form failure if you fill it right up - so we're careful when installing over
rebar."
From a cost standpoint,
Brian views the Fast-Tube™ as a winner. "In the past, 12'
cardboard tubes would be delivered on the ready mix truck along with
the concrete to minimize water damage. Now we include the Fast-Tube™ in our contract,
we make a markup on the fabric, and the owner gets each column
for about half the cost. Everyone wins."
|