|
Materials |
Fastfoot® |
Lumber |
|
Vertical 2x4 |
same |
same |
|
Plywood bulkhead |
same |
same |
|
Fastfoot® |
$2.72 |
$0.00 |
|
Step sides (plywood 2' x 5') |
$0.00 |
$17.50 |
|
Stakes, bracing for side plywood |
$0.00 |
$3.25 |
|
Disposal costs of side forms |
$0.00 |
$1.75 |
|
TOTAL MATERIALS |
$2.72 |
$22.50 |
|
|
|
|
|
Labor (minutes) |
Fastfoot® |
Lumber |
|
Install vertical 2x4s |
same |
same |
|
Install Fastfoot® |
4 |
0 |
|
Dig step area to accept lumber |
0 |
7 |
|
Cut plywood side forms, stakes |
0 |
8 |
|
Install and brace side forms |
0 |
15 |
|
Screw bulkhead |
same |
same |
|
Strip side forms |
0 |
10 |
|
Transport, dispose side forms |
0 |
5 |
|
TOTAL TIME |
4 |
45 |
|
TOTAL LABOR COST ($25/hr) |
$1.67 |
$18.75 |
|
|
|
|
|
TOTAL MATERIALS & LABOR |
$4.39 |
$41.25 |