The following table details the additional costs associated with each method. Fastfoot® saved the owner $5,975, primarily due to reduced blasting and excavation. Forming labor and materials were also reduced considerably by using Fastfoot®.

Item Lumber Fastfoot®
Site preparation - extra machine, blasting $4,925 $      0
Forming labor - extra       600          0
Forming lumber - wasted  450          0
Fastfoot® fabric          0      150
Total $ 5,975 $   150

 