The following table details the
additional costs associated with each method. Fastfoot® saved the owner
$5,975, primarily due to reduced blasting and excavation. Forming labor and
materials were also reduced considerably by using Fastfoot®.
| Item |
Lumber |
Fastfoot® |
| Site preparation - extra machine, blasting |
$4,925 |
$
0 |
| Forming labor - extra |
600 |
0 |
| Forming lumber - wasted |
450 |
0 |
| Fastfoot® fabric |
0 |
150 |
| Total |
$ 5,975 |
$ 150 |
|
|