-
Drive pairs of
wood or steel stakes in the ground every 6' to 10' spaced the
footing width apart.
-
Using a laser or builder's level, nail
(or screw) the 2x4s to the inside of the stakes at the height of the desired footing.
-
Unroll Fastfoot® between the 2x4s, and staple in
the correct position using the colored adjustment lines and a hammer tacker with 3/8" staples.
-
Place concrete.
Detailed Installation
Click
here to download the Fastfoot® Installation Manual (PDF)
Click here for a technical update on
folded corners (thanks to Rick Umpierre, Esko, Minnesota).
Click here to view a PowerPoint presentation of Fastfoot®.
|
Fastfoot® residential video |
 |
|
Fastfoot® commercial video |
 |
|