Contact Us    Sitemap    Search

 


» PRODUCTS > FASTFOOT® > INSTALLATION

  1. Drive pairs of wood or steel stakes in the ground every 6' to 10' spaced the footing width apart.

  2. Using a laser or builder's level, nail (or screw) the 2x4s to the inside of the stakes at the height of the desired footing.

  3. Unroll Fastfoot® between the 2x4s, and staple in the correct position using the colored adjustment lines and a hammer tacker with 3/8" staples.

  4. Place concrete.

Detailed Installation

Click here to download the Fastfoot® Installation Manual (PDF)

Click here for a technical update on folded corners (thanks to Rick Umpierre, Esko, Minnesota).

Click here to view a PowerPoint presentation of Fastfoot®.
 

Fastfoot® residential video

Fastfoot® commercial video

 

TOP
 
1-888-303-3278

©2008 Fab-Form Industries Ltd. All rights reserved
Registered trademarks are the property of Fab-Form Industries Ltd.