|
step |
description |
photo |
| 1. |
Lay Fastbag® on ground at desired location. Hammer nail or a short length of reinforcing through the center of the bag to
locate. If reinforcing is required, slide mat through opening on top
of bag and place on chairs. |
 |
| 2. |
Fill Fastbag® with concrete to the desired depth. No need to trowel, just kick the bag
to level top.
And no stripping. |
 |