Contact Us    Sitemap    Search

 

» PRODUCTS > FASTBAG® > INSTALLATION

For Fastbag® video, click here.

For PDF of installation guide, click here.

step

description

Drawing
1.

Insert reinforcing grid through Fastbag® opening.

2.

Position Fastbag® and drive rebar stake through center with top of stake at footing height.

Lift reinforcing on chairs for concrete coverage.

3.

Lift edge of Fastbag® and fill with concrete to top of rebar stake. Screed level.

FAST-TUBE™

When using Fast-Tube™, drive several nails through two short lengths of 1x4 and position on wet concrete as shown.These lengths will locate a 1x4 nailing plate for attaching the Fast-Tube™.

Click here for Fast-Tube™ installation.

FAST-TUBE™ MONOPOURING

Set up batterboards with a 2x4 nailing plate between for attaching Fast-Tube™ 2x4s.

Click here for Fast-Tube™ installation.


TOP
 
1-888-303-3278

©2010 Fab-Form Industries Ltd. All rights reserved
Registered trademarks are the property of Fab-Form Industries Ltd.