A recent project of Chateau Homes used the Fastfoot® Monopour System with pre-attached Fastfoot® and sewn corners.
"We have done three monopour projects ", said Peter Francis, President of Chateau Homes Ltd., "but installing and folding fabric on the jobsite always took a fair bit of time. This project had the fabric pre-attached with sewn corners. It took less than a day to get the basics of the ICF foundation complete."
Click here for installing the monopour system with sewn corners.
A sewn Fastfoot® corner creates the perfect footing.
Fastfoot® is pre-attached to a standard 12' component.
Installing a custom component with pre-attached fabric.
Ready to install two straight components with pre-attached fabric.
All lower level components with pre-attached Fastfoot® are now installed.
Sewn corner before concrete.
Sewn corner being filled with concrete.
Sewn corner, after concrete.
Fastfoot® protects the bottom, sides and top of footing from ground moisture.
Pouring the foundation with presewn and pre-attached fabric.Foundation components are now manufactured with pre-attached footing fabric, saving contractors time on the jobsite.
Sewn corners, T-junctions and steps are now available in three sizes: 50", 62" and 74", with custom sizes also available.
"We listened to our customers", said Richard Fearn, Fab-Form Industries. "They told us folding and attaching the fabric was a challenge. We eliminated these steps and streamlined the monopour system yet again."
Click here for installing the monopour system with sewn corners.